BALLACHULISH BRIDGE

Highlands, Scotland
Rope Access Bridge Inspection
Keeping the highlands accessible

SG was delighted to be appointed as the rope access bridge inspection team to carry out the inspection of the bridge deck bearings of Span 2 of A82 Ballachulish Bridge, utilising rope access as the mode of access.

Type: Rope Access
DURATION: 1 WEEK
TEAM: 3 PEOPLE
WORK SCOPE

Working closely with our valued client, the SG rope access bridge inspection team inspected and compiled a detailed photographic report, assessing and recording the condition of the bridge deck bearings, including meticulous inspection of the paint system, corrosion, position and material integrity of the bearings upper and lower plates, load distribution plates, welds, nuts & bolts and PTFE/Rubber.

SIMILAR PROJECTS

COLTBRIDGE VIADUCT

Rope Access

FORTH ROAD BRIDGE

Rope Access

CONNEL BRIDGE INSPECTION

Rope Access

KATRINE AQUEDUCT

Rope Access

ASK US A QUESTION

…call us and we’ll talk numbers. If you’d like us to prepare a proposal for a specific project or you’d like more information, please call or email. Or use our chat facility, and we’ll get right back to you.