Glazing at height via rope access
An impressive multi layered glass structure, SG were contracted to perform the high level glazing and mastic works at the Co-Op building in Manchester, using rope access techniques and temporary fall arrest solutions to enable safe access.
WORK SCOPE
The giant glazed stepped lattice roof of the atrium lightwell at the building’s heart is an intricate jigsaw of sloping and curved glass that required rope access teams for preparation, installation and sealing of the glazed units, as well as related elements of the building fabric located at height.
SG supplied a 10 man team of IRATA qualified abseilers to conduct glazing and mastic pointing works at height using industrial rope access techniques to gain safe access to the work zones.
ASK US A QUESTION
If you’d like us to prepare a proposal for a specific project or you’d like more information, please call or email. Or use our chat facility, and we’ll get right back to you.